Image Image Image Image Image
Scroll to Top

To Top

Seite wählen:

Construction of a new wildlife crossing over the A 13 by Teupitz.

Objektbeschreibung

The structure is designed as a frame with prefab compound elements for subsequent 6-lane expansion of the A 13, incorporating a standard cross-section (SC) of 36.0.

Bridge surface 2,765 m², span length 46.00 m, width between the railings 60 m.

Bauherr

Brandenburg Office of Motorway and Road Construction
Stolpe, an der Autobahn A 111
165040 Hohen Neuendorf

Ausführungszeit

2010 – 2011